In short
- Mainstream maintenance for SAP ERP 6.0 ends on 31 December 2027, and optional extended maintenance runs until the end of 2030 (SAP News, 4 Feb 2020).
- Large systems can keep running under the transition option until 31 December 2035 at the latest, subject to clear prerequisites (SAP News, update 13 Oct 2026).
- For quotes and orders, two master data changes matter: customers become business partners (SAP Learning, business partner), and material numbers can be up to 40 characters long (SAP Learning, material master).
- Scalera lists SAP R/3, ECC, S/4HANA (on-premise, private and public cloud) and Business One among its integrations. Prices stay in the ERP (ERP integrations).
As of 22 November 2026. SAP information checked on news.sap.com, learning.sap.com and help.sap.com. Not advice on SAP contracts or licences.
What changes in 2027 for SAP ERP customers?
Mainstream maintenance for the core applications of SAP Business Suite 7 ends in late 2027. These include SAP ERP 6.0, SAP CRM 7.0, SAP SCM 7.0 and SAP SRM 7.0 (SAP News, 4 Feb 2020). In its post on the transition option, SAP names the core product SAP ERP Central Component, ECC for short (SAP News, update 13 Oct 2026).
From 2028 SAP offers two paths. Extended maintenance runs until the end of 2030 and costs two percentage points more on the existing maintenance base. If you do not decide by the end of 2027, you move automatically to customer-specific maintenance, which covers solutions for known issues (SAP News, 4 Feb 2020).
What is the transition option?
For the largest and most complex systems, SAP offers «SAP ERP, private edition, transition option», a time-bound cloud subscription from 2031. Since the update of 13 October 2026, these subscriptions may run until 31 December 2035, with further prerequisites (SAP News, update 13 Oct 2026).
Prerequisites include a move to SAP ERP, private edition on SAP HANA before 31 December 2030 and a system size of at least 2 TB (SAP News, update 13 Oct 2026). For systems below that size, the 2027 and 2030 timeline still applies.
| Period | What applies | For whom |
|---|---|---|
| to end of 2027 | mainstream maintenance | Business Suite 7, e.g. ERP 6.0 |
| 2028 to 2030 | extended maintenance, +2 points | optional |
| from 2028 | fixes for known issues | no decision by end of 2027 |
| 2031 to 2035 | transition option | private edition, 2 TB+ |
| to 2040 | maintenance commitment | SAP S/4HANA |
Sources: SAP News, 4 Feb 2020 and SAP News, 4 Aug 2025, update 13 Oct 2026.
Which S/4HANA editions are there?
S/4HANA runs in your own data centre (on-premise) or in the cloud as private or public edition. In its post on the transition option, SAP names SAP Cloud ERP or SAP Cloud ERP Private as the target (SAP News, update 13 Oct 2026).
For your quote and order tool, what matters is which edition is coming and which interfaces are released there. Clarify this with your SAP team or partner before you plan a connection.
Scalera lists all three S/4HANA editions as well as SAP ECC, SAP R/3 and SAP Business One among its integrations (ERP integrations). A change within SAP therefore does not mean changing the tool.
Why do customers become business partners in S/4HANA?
In S/4HANA the business partner is the single entry point to create and maintain customer and supplier master data. Transactions such as XD01 or VD01 are no longer available, and transaction BP replaces them (SAP Simplification List 1610).
Before conversion, all customers and suppliers have to be converted to business partners through Customer Vendor Integration (CVI). The account group remains and still determines the partner functions in sales documents (SAP Learning, business partner).
What does this mean for incoming orders and requests?
Every order and every bill of quantities has to be assigned to a customer before an order or quote is created. If numbers change during the move, every mapping table needs a column for old and new: in EDI, in the web shop and in AI tools.
In Scalera, order processing captures delivery date, contact person and delivery and billing address alongside the lines. After the move, this data has to land on the right partner functions of the business partner.
What does the longer material number mean for product matching?
S/4HANA allows material numbers of up to 40 instead of 18 characters. The function is switched off after the move and in new installations, and has to be activated explicitly (SAP Learning, material master).
In the standard setup, purely numeric material numbers stay at 18 characters and are padded with leading zeros (SAP Learning, material master). If you keep your article numbers, you will see little difference in the catalogue.
Interfaces are different: BAPI, RFC and IDoc rely on fixed field lengths. SAP keeps the old field there and adds a new field for 40 characters. According to SAP, released web services generally already allow up to 60 characters (SAP Learning, material master).
Do not just ask whether your tool supports SAP. Ask which version of your customer and material numbers it reads after the move.
What should you check in the product catalogue?
- Check exports with fixed column widths (CSV, Excel templates) for 40 characters if you activate the function.
- Keep old and new material numbers side by side for a transition period so that matches from earlier quotes stay usable.
- Check units of measure and packaging units at the same time (units of measure conversion).
- Reload the catalogue for matching. Scalera takes product data by upload or through a live API, for example from SAP (FAQ). How to prepare the data is covered in the guide to product data for AI matching.
Automate before, during or after the move?
There is no timing that suits everyone. What counts is how long your move takes and how much manual work builds up until then. The three paths compared:
| Timing | Benefit | Watch out for |
|---|---|---|
| Before | relief now, master data cleaned | move the connection later |
| With the move | one test cycle for both | project load adds up |
| After | only one target system | manual work until then |
Editorial assessment, not an SAP requirement.
Scalera puts its rollout at immediately for some modules, otherwise within a maximum of two weeks; for Enterprise, it depends on the company's data foundation (ERP integrations). If your S/4HANA go-live is much further away, starting on the current system can relieve your back office sooner.
Which interfaces work for quotes and orders?
Scalera offers ready interfaces in SAP IDoc format, a REST API, configurable formats and exports via CSV, XML or GAEB (ERP integrations, FAQ). BAPI, RFC and IDoc remain released interfaces in S/4HANA, and SAP has extended them for the longer material number (SAP Learning, material master).
What IDocs are and how Dynamics or Abacus connect is covered in the article on ERP integration. When EDI is enough for orders is covered by the EDI checklist. For the move, five questions for IT or your partner matter:
- Which S/4HANA edition and which go-live date are planned?
- Will customer and material numbers stay the same, or will they be re-keyed?
- Will the 40-character material number be activated, and from when?
- Which interfaces are released in the target system: IDoc, REST or file import?
- Who maintains the mapping tables during the transition, and how long do both systems run in parallel?
How do you test the connection during the move?
Test with real documents from daily business, not with sample data. How to set up a pilot is described in the test plan with your own bills of quantities. For an SAP move, add these steps:
- Collect a sample of real orders and bills of quantities across PDF, Excel, email, photo and GAEB.
- Run the matching in the test system against the new customer and material master.
- Sort deviations by cause: customer number, material number, unit, partner function.
- Check the handover: order or quote complete, delivery and billing address correct.
- Set the cutover date: when new numbers apply and who re-keys open quotes.
Scalera flags uncertain matches with a confidence score. Your team decides before the order goes to the ERP (order processing). During a move, this review step shows early where master data does not fit yet.
What stays in SAP and what does Scalera take on?
Price calculations stay in your ERP or CRM system (ERP integrations). Scalera reads tenders and orders, matches the lines to your catalogue and hands the result to the ERP (product matching, order processing).
- Scalera: read bills of quantities in PDF, scan, Excel, GAEB, NPK or ÖNORM and orders from PDF, Excel, email or photo, match lines, show confidence, hand over.
- SAP: business partner, material master, pricing, and the quote and order as documents.
The full flow from incoming order to sales order is covered in the article on order processing automation.
Frequently asked questions
When does maintenance for SAP ECC end?
Mainstream maintenance for SAP ERP 6.0 ends on 31 December 2027. After that you can opt for extended maintenance until the end of 2030, or you move automatically to customer-specific maintenance (SAP News, 4 Feb 2020).
Do I need a new quoting tool for S/4HANA?
Not if the tool connects to both. Scalera lists SAP R/3, SAP ECC and S/4HANA on-premise, private cloud and public cloud among its integrations (ERP integrations). You still test the connection again.
Does Scalera work with SAP Business One?
Yes. SAP Business One is one of the 34 ERP systems listed on the ERP integrations page.
Will my customer numbers stay the same after the move?
Your project decides. SAP recommends keeping the business partner ID the same as the customer or supplier ID, but does not require it (SAP Learning, business partner).
What happens to open quotes on the cutover date?
Decide in advance whether open quotes expire in the old system or move to the target system with new numbers. Either way you need a list of old and new customer and material numbers.
Can Scalera read product data directly from SAP?
Yes. Product data comes in by upload or through a live API integration, for example with SAP (FAQ). Price calculations stay in your ERP or CRM.
How long does it take to implement Scalera?
Scalera goes live immediately for some modules and otherwise within a maximum of two weeks. For Enterprise introductions, the timeline depends on the company's data foundation. (ERP integrations, FAQ).
Is the transition option available for smaller SAP systems?
No. It requires a system size of at least 2 TB and a move to SAP ERP, private edition on SAP HANA before the end of 2030 (SAP News, update 13 Oct 2026).
Key takeaways
- Mainstream maintenance for SAP ERP 6.0 ends in late 2027. Extended maintenance runs to 2030, and the transition option to 2035 is for large systems only.
- For quotes and orders, two changes affect you directly: the business partner and the material number.
- Every interface for orders and bills of quantities needs a mapping from old to new numbers during the transition.
- Whether you automate before, with or after the move depends on your timeline and manual workload, not on SAP.
- A tool that supports ECC and S/4HANA does not need replacing, but it needs a new test. A demo shows how this looks with your SAP.
Disclosure: This article is published by Scalera. It is not advice on SAP contracts, maintenance or licences. SAP's current information and your contract are authoritative.
Sources
- SAP News, SAP Extends Its Innovation Commitment for SAP S/4HANA, Provides Clarity and Choice on SAP Business Suite 7, 4 Feb 2020, accessed 22 Nov 2026
- SAP News, Navigating Your RISE with SAP Journey: Updates for SAP ERP, Private Edition, Transition Option, 4 Aug 2025 with update of 13 Oct 2026, accessed 22 Nov 2026
- SAP Learning, Working with Business Partners and Listing Simplifications for the Material Master in SAP S/4HANA, accessed 22 Nov 2026
- SAP, Simplification List for SAP S/4HANA 1610 FPS2, section Business Partner Approach, accessed 22 Nov 2026
- Scalera, ERP integrations, order processing, product matching and FAQ, accessed 22 Nov 2026
