As of 27 November 2026. Resource type: checklist. The publisher is Scalera, a provider of software for order intake and quotes. Legal basics are based on Wikipedia and are not legal advice. Scalera features are backed by the relevant product page.
In short
- Match before you confirm: Every purchase order that follows a quote is checked against that quote before the order confirmation goes out.
- Ten checks in three blocks: reference to the quote, line items, delivery and terms.
- Clarify deviations, do not overwrite them: if your order confirmation deviates from the purchase order, German law treats it as a rejection combined with a new offer (§ 150(2) German Civil Code).
Sources: Wikipedia (Auftragsbestätigung, Kaufmännisches Bestätigungsschreiben, Purchase order, Mirror image rule), Scalera (order processing, ERP integrations), retrieved 27 November 2026.
Why the check before the order confirmation matters
A purchase order states the types, quantities and agreed prices of the products required (Wikipedia, Purchase order). With the order confirmation you accept it. Under German law, an acceptance with extensions, restrictions or other changes counts as a rejection combined with a new offer (§ 150(2) German Civil Code). If your confirmation deviates from the purchase order, no contract is formed at that point. Examples are a reference to your own terms, a different price or a changed specification (Wikipedia, Auftragsbestätigung). The same rule works the other way round: if the purchase order deviates from your quote, it is itself a new offer, and your confirmation accepts it.
Common law has the mirror image rule: an offer must be accepted without modification, otherwise it becomes a counter-offer (Wikipedia, Mirror image rule). For inside sales this leads to a simple rule: match first, then confirm. Which customers are better served by EDI is covered in the EDI checklist.
The checklist: 10 checks in three blocks
Work through the checks in this order. The table gives the question for each check and what to do if something deviates.
| Check | Question | If it deviates |
|---|---|---|
| 1 Reference | Does the order quote the offer number? | Find quote, ask customer |
| 2 Validity | Is the quote still valid? | Requote or confirm |
| 3 Item | Do item and variant match? | Clarify variant |
| 4 Quantity | Does the quantity fit the quoted unit? | Ask for the unit |
| 5 Price | Is the unit price correct? | State quoted price |
| 6 Scope | Are lines missing or new? | Quote new lines |
| 7 Date | Is the requested date feasible? | Propose a date |
| 8 Addresses | Delivery and billing address complete? | Request address |
| 9 Contact | Who is the contact person? | Request contact |
| 10 Terms | Does the customer refer to own terms? | Clarify first |
Scalera's check grid, meant for order processing at manufacturers and distributors.
Checks 1 and 2 form the reference, 3 to 6 the line items, 7 to 10 delivery and terms. If a check is open, the order stays in clarification instead of being confirmed with a silent correction.
Possible deviations and how to clarify them
- Price from an older quote: State the valid quoted price and the quote number in your question.
- Pieces instead of packs: The quantity only fits a different unit. Ask which unit is meant.
- Different variant: Colour, size or version differs from the quote. Clarify whether the customer wants to switch.
- Additional lines: For items without a quote, send a price first, then the confirmation.
- Own purchasing terms: The customer refers to its terms. Clarify this before confirming, not afterwards.
An order confirmation is not a correction tool: clarify what deviates first, otherwise your confirmation becomes a new offer itself.
Template: follow-up question on a deviation
Keep the question short: quote number, affected line, both readings and what happens after the answer. A fictitious example:
«Thank you for your order on quote A-2611. In line 3 you order 40 pieces, we quoted the pack of 10 pieces. Do you mean 40 pieces, so 4 packs, or 40 packs? As soon as this is clear, we will send you the order confirmation.»
Record the customer's answer with the order. That way it stays traceable why the confirmation looks the way it does. How units are converted in quotes is covered in units of measure conversion.
How to put the checklist to work in inside sales
- Make the quote number mandatory: Every order gets its quote reference before the check.
- Put lines side by side: Check item, quantity, unit and price per line against the quote.
- Flag deviations: Every open line gets a note instead of a silent correction.
- Send the question: Use the template above, one message for all open points.
- Only then confirm: The order confirmation goes out once all ten checks are clear.
Where Scalera helps in this process
Before you can match, the order has to be captured. According to the product page, Scalera accepts PDF, Excel, email text, photos and scans, including additions by hand, and looks up the item in your product catalogue for every line. Each match carries a confidence score; unclear ones are marked (order processing).
The header data (delivery date, contact, both addresses) is captured as well, so the data for checks 7 to 9 is already there. Only after your team releases it does the order move into your ERP, such as SAP S/4HANA, Abacus, Proalpha or Microsoft Dynamics 365 (order processing, ERP integrations).
Scalera creates quotes for tenders with Product Matching. The flow from order intake to ERP is described in order processing automation, choosing a solution in the guide choosing AI order entry. Which reading technology helps is covered in OCR or AI. In a demo you can look at this with real orders from your inbox.
Frequently asked questions
Do I always need an order confirmation?
Not always. According to Wikipedia, if the order follows a quote, a confirmation can be skipped. It is issued in particular when the offer was changed, accepted late or was non-binding (Wikipedia, Auftragsbestätigung). In exactly those cases this checklist pays off.
What happens if my order confirmation deviates from the purchase order?
Under German law, it counts as a rejection combined with a new offer (§ 150(2) German Civil Code). A contract is only formed once the customer accepts that new offer. Examples are a different price, a changed specification or a reference to your own terms (Wikipedia, Auftragsbestätigung). Common law is similar: an acceptance with modifications is a counter-offer (Wikipedia, Mirror image rule). For a specific case, your contract and your legal advice apply.
Does the customer's silence count as consent?
Not for a deviating order confirmation, as a rule, not even between merchants (Wikipedia, Auftragsbestätigung). The commercial letter of confirmation is different: its content counts as accepted if the recipient does not object without delay. In Switzerland it can also take legal effect if it is not objected to in time and does not deviate so far from the negotiated result that consent cannot be expected in good faith (Wikipedia, Kaufmännisches Bestätigungsschreiben).
What do I do if the customer orders in a different unit?
Do not confirm on a guess. Check whether the quantity fits the packaging unit in the quote, and ask if two readings are possible. The article units of measure conversion shows the conversion step by step.
How does Scalera help with incoming orders?
Scalera captures orders in any format, including photos and scans, looks up the matching catalogue item for every line and flags low-confidence matches. Release only happens after your team has checked (order processing). The systems are listed on the ERP integrations page.
