Award criteria in construction: how your bid is scored

When you bid in a public tender, you are scored against criteria fixed in advance. Since 1 March 2026 Austria has turned its rule around: the technically and economically most advantageous bid is now the default. Here is what applies in the three countries and how to shape your bid around it.

Abstract illustration: a balance with one price block and several quality blocks, next to three bars of different heights as a ranking.
Introduction
Read the award criteria and their weighting first, then price. Where quality, deadlines or life-cycle costs earn points, the data from manufacturers and dealers counts as much as the price.

3

types of aspects besides price or cost named in German law: qualitative, environmental, social (Section 127 GWB)

19

example criteria listed in Art. 29 of the Swiss PPA besides price and quality

2026

Since 1 March, the technically and economically most advantageous bid is the rule in Austria (Section 91 BVergG 2018)

150+

manufacturers, dealers and general contractors across Europe use Scalera (Scalera)

In short

  • Germany: the contract goes to the most economically advantageous bid, meaning the best price-quality ratio (Section 127 GWB).
  • Austria: since 1 March 2026 the technically and economically most advantageous bid is the rule and lowest price the exception (Section 91 BVergG 2018).
  • Switzerland: the most advantageous bid wins. Art. 29 lists 19 example criteria besides price and quality (PPA (BöB)).
  • Criteria and weighting are in the notice or the tender documents. Read them before you price and you know where the points are.

As of 23 Nov 2026. Legal texts checked on gesetze-im-internet.de, ris.bka.gv.at, fedlex.admin.ch and bpuk.ch (German originals). Not legal advice.

What are award criteria?

Award criteria are the yardsticks a contracting authority uses to compare valid bids and pick the best one. They score the bid, not the company. The company is checked against separate selection criteria, such as experience or financial capacity (PPA Art. 27).

For you this means: first you have to qualify, then the score of your bid decides. A bidder who fails selection is never scored.

Why do they matter to manufacturers and dealers?

In a works contract the contractor submits the bid. Manufacturers and dealers supply prices, data sheets and delivery commitments. When quality, deadlines or life-cycle costs earn points, this information helps decide which contractor wins and which product gets installed.

What applies in Germany?

From the EU thresholds, which follow from Directive 2014/24/EU (Section 106 GWB), Section 127 of the Act against Restraints of Competition (GWB) applies. The contract goes to the most economically advantageous bid. The yardstick is the best price-quality ratio, and besides price or cost, qualitative, environmental or social aspects may count (Section 127 GWB).

The criteria must be linked to the subject of the contract. That includes production, trade or any other stage in the life cycle of the work. Criteria and weighting are stated in the notice or the tender documents (Section 127 GWB).

Works contracts and supply contracts: which rules apply?

For works contracts the Procurement Ordinance refers to Section 2 of the VOB/A (Section 2 VgV). For supply and service contracts Section 58 VgV gives examples: quality and technical merit, after-sales service and technical assistance, and delivery date and delivery periods.

The weighting may be given as a range. Where that is not possible for objective reasons, the authority lists the criteria in descending order of importance (Section 58(3) VgV).

What changed in Austria on 1 March 2026?

Since 1 March 2026 a new version of Section 91 of the Federal Procurement Act 2018 (BVergG 2018) applies. The contract is in principle awarded to the technically and economically most advantageous bid. An award to the lowest price is only allowed for clearly and completely described work (Section 91 BVergG 2018).

Until the end of February 2026 the authority could choose. The most advantageous bid was mandatory only in listed cases, for example works contracts with an estimated value of at least 1 million euros (Section 91 BVergG 2018, version of 1 Feb 2026). That list no longer appears in the new version.

The authority determines the best price-quality ratio with a cost model or with published award criteria. The criteria are stated in the documents with their importance, as a weighting, a margin or an order (Section 91(6) BVergG 2018).

What applies in Switzerland?

At federal level the most advantageous bid wins (PPA Art. 41). Art. 29 of the Federal Act on Public Procurement (PPA, BöB) lists 19 example criteria besides price and quality, including deadlines, technical merit, life-cycle costs, sustainability, after-sales service and delivery terms (PPA (BöB)).

Criteria and weighting are published in the notice or the tender documents. Where work and price are submitted in two envelopes, a quality ranking comes first and the prices are scored afterwards (PPA Art. 29 and 38).

For cantons and municipalities that have joined the IVöB 2019, its Art. 29 applies. It lists 17 example criteria as an option, and for standardised services the lowest price may decide alone (IVöB 2019).

Award rules compared
CountryYardstickWeighting
Germanybest price-quality ratiopublished, also as a range
Austriatechnically and economically most advantageous bidweighting, margin or order
Switzerland, federalmost advantageous bidpublished, with exceptions
Switzerland, cantonsmost advantageous bidpublished, with exceptions

Sources: Section 127 GWB, Section 58 VgV, Section 91 BVergG 2018, PPA Art. 29 and 41, IVöB 2019 Art. 29 and 41.

How do price and quality become a ranking?

The authority sets how many points each criterion is worth and how price is converted into points. The formula is in the documents and differs from tender to tender. The example below is made up and only shows the principle.

Assumption: price is worth 60 points and quality 40. The cheapest bid gets the full 60 price points, every other bid a share in proportion to the cheapest price.

Worked example (fictitious): price 60 points, quality 40 points
BidPrice + qualityTotal
A: price 100,00060.0 + 2080.0
B: price 108,00055.6 + 3489.6
C: price 125,00048.0 + 3886.0

Made-up figures, not a legal requirement. The formula of the contracting authority applies.

Bid B is 8 percent more expensive than A and still wins because it scores 14 more quality points. With another weighting or formula the order can flip. So run the numbers with the formula from the documents before you think about discounts.

Price is one criterion among several. Know the weighting and you know where effort in the bid pays off.

What does your product contribute to the score?

Several example criteria in PPA Art. 29 and Section 58 VgV depend directly on the product and its delivery. The contractor can only score there if the manufacturer or dealer supplies the information in time:

Criterion and matching information
CriterionWhat the bidder needsFrom whom
Technical meritdata sheet, performance valuesmanufacturer
Life-cycle costsservice life, maintenance, spare partsmanufacturer
Sustainabilityenvironmental data, evidencemanufacturer
Deadlineslead time, availabilityboth
After-sales serviceservice, contact personboth

Criteria as listed in PPA Art. 29 and Section 58 VgV. Which information counts is stated in each tender's documents.

Which information from the declaration of performance belongs in the bid is explained in Declaration of performance in tenders. If you offer an equivalent product instead of the specified one, the bidder needs the same information for scoring (offering spec-compliant alternatives).

Where are the criteria and how do you read them?

Criteria and weighting are in the notice or the tender documents (Section 127(5) GWB, PPA Art. 29(3)). So do not look for them only in the bill of quantities. These questions help when reading:

  1. Which yardstick applies: price only, price-quality ratio or a cost model?
  2. Which criteria are there, and how are they weighted: points, percent, range or order?
  3. How is price converted into points, and which formula is behind it?
  4. Which evidence does each quality criterion require, and by when?
  5. Are alternative bids allowed, and do the same criteria apply to them?

If a criterion is unclear, ask a clarification question within the deadline instead of guessing (clarification questions). Where to find public tenders is shown in Finding public tenders.

How do you align your bid with the criteria?

  1. Before pricing, read the weighting and identify the largest criterion after price.
  2. Use the formula from the documents to check how many points a discount earns and how many a stronger quality proof earns.
  3. Ask manufacturers and dealers early for the information that counts for quality, deadlines or life-cycle costs.
  4. Assign each piece of evidence to the criterion it belongs to, so the authority finds it.
  5. After the award, review points and rank and record them for the next tender.

Whether a bid is worth it at all is something you settle first with a simple framework (bid or no bid).

Where does software help and what do you decide?

Scalera sorts incoming tenders by estimated order volume and shows the deadline and matches from your range (project triage). In risk analysis Scalera reads the whole tender, even across several chapters, and keeps the points to check in a checklist.

For the line items Scalera suggests matching products with reasoning and confidence, spots missing accessories and shows alternatives (product matching, FAQ). General contractors compare incoming quotes line by line in quote comparison.

Which criteria you prioritise, how you read the weighting and whether you bid is up to your team. Software provides the basis, not the decision.

Frequently asked questions

What is the difference between selection and award criteria?

Selection criteria assess the company, such as its technical and financial capacity or experience. Award criteria score the individual bid (PPA Art. 27 and 29).

Does the contracting authority have to publish the weighting?

Yes, in principle in the notice or the tender documents (Section 127(5) GWB, Section 91(6) BVergG 2018, PPA Art. 29(3)). There are exceptions, such as a range or an order of importance.

Can price alone decide a public construction contract?

In Germany the best price-quality ratio is the yardstick (Section 127 GWB); details for works contracts are set in the VOB/A. In Austria price alone is allowed only for clearly and completely described work (Section 91 BVergG 2018). In Switzerland it is allowed for standardised services, at federal level only if the specification ensures high sustainability requirements (PPA Art. 29(4), IVöB 2019 Art. 29(4)).

Do these rules apply to private tenders too?

No. GWB, BVergG and PPA govern awards by public contracting authorities. Private clients and general contractors set their own criteria. How a general contractor scores quotes beyond price is covered in the bid comparison guide.

Are alternative bids scored on the same criteria?

In Germany the criteria must be set so they apply to both main and alternative bids (Section 127(4) GWB). What an alternative bid is, is explained in the glossary on main and alternative bids.

What applies to Swiss cantons and municipalities?

Cantons that have joined apply the IVöB 2019. Its Art. 29 is built like the federal one but lists the criteria as an option (“may”) and allows price-only awards for standardised services without an extra condition.

Can I ask if a criterion is unclear?

Yes, through a clarification question within the deadline. How to word it is shown in Tender clarification questions on the BoQ.

Does Scalera extract the award criteria for me?

Scalera reads the whole tender, even when requirements are spread across chapters, and keeps the points to check in a checklist (risk analysis). Scoring the criteria and deciding stays with you and your team.

Key takeaways

  • Award criteria score the bid, selection criteria the company.
  • Germany: most economically advantageous bid by price-quality ratio. Austria: since 1 March 2026 the technically and economically most advantageous bid is the rule. Switzerland: most advantageous bid.
  • Weighting and price formula are in the documents. Run the numbers with them before you decide on discounts.
  • Quality, deadlines and life-cycle costs depend on product data. Manufacturers and dealers supply points, not just prices.

Next steps

Take your next public tender and put criteria, weighting and price formula on one page before you price. To see how Scalera reads and prioritises tenders, book a demo.

Transparency note: this guide is published by Scalera. It is not legal advice. The legal texts and the documents of each procedure apply.

Sources

  1. Germany: Section 127 GWB, award, Section 106 GWB, thresholds, Section 2 VgV, works contracts, Section 58 VgV, award and award criteria, gesetze-im-internet.de (German), accessed 23 Nov 2026
  2. Austria: Section 91 BVergG 2018, valid from 1 Mar 2026 and Section 91 BVergG 2018, version of 1 Feb 2026, RIS (German), accessed 23 Nov 2026
  3. Switzerland: Federal Act on Public Procurement (BöB), SR 172.056.1, as of 1 Jan 2026, Art. 27, 29, 38 and 41 (German), accessed 23 Nov 2026
  4. Switzerland: Intercantonal Agreement on Public Procurement (IVöB 2019), Art. 29 and 41, BPUK (German), accessed 23 Nov 2026